30-Day Walkthrough Inspections
On October 13, 2018 new federal UST regulations took effect requiring that all owners/operators of the nation’s regulated USTs should have completed their first 30-Day walkthrough inspection. Since that time, Tanknology’s Inspection Services Division has performed more than 250,000 walkthrough inspections, covering fueling facilities of all shapes and sizes, in all 50 states.
Statistics show that close to 90 percent of the sites that Tanknology inspects monthly have minor deficiencies. Many times, it is something as small as liquid in a spill bucket. Other times, however, the deficiencies are more serious, such as corrosion on metallic components in a sump or piping failures.
As inspection program matures, the severity of the operational compliance issues become less and the environment cleaner. Tanknology’s 30-Day Inspections is proactive facility maintenance at its best.
As our customers have looked to us for help with periodic inspections, many have taken the opportunity to expand beyond simply what the EPA is requiring, and use these site visits to inspect and verify key aspects of their site operations.
Tanknology has created several packages that include the most popular combinations of our inspection services.
These packages are highly flexible. Specific services can be mixed and matched to create the inspection service that is right for your operation.
Additionally, our best-in-class program offers a comprehensive, on-demand database with 24/7 access to site information in order stay on top of mission critical business intelligence, streamline corrective action and analyze trends in operating conditions.
To learn more, or to discuss specific compliance needs for your site, call us today at 1-800-964-1250.
Learn More
At A Glance
Package A: REQUIRED
Designed to meet minimum Federal regulations. Includes:
• Spill Prevention inspection
• Release Detection inspection
• Manual gauge stick inspection
• Sump inspection
• 24/7/365 access to TANCS
• Site Notifications
Package B: ENHANCED
Includes Package A, and:
• Full-service management of TANCS inspection module
• Email notification of all deficiencies
• Removal and on-site disposal of liquid
• Visual inspection of non-required items
• Verification inspection of recently alarmed STP
• Spill bucket lid painting
Package C: BEST PRACTICES
Includes Packages A & B, plus:
• Monthly visual inspection of STP sumps
• Caps, gaskets and decal replacement
Package D: FULLY MANAGED
Includes Packages A, B & C, plus…
• Remote monitoring of ATG console
• Fuel quality checks
• Compliance testing
• Repair tracking and close out